Application Form for New Connection

Scroll over the field and follow the tooltip to know the designation of the field. * means obligatory field and ** means conditional obligation user.

1.Type Of Request (Please tick):
2.Connection Enter:
3.Details Of Applicants:

Upload Outline Image

Passport Large Photograph Of that applicant.Please Upload valid image(.jpg .jpeg .gif .png ) file. File Size should be less than 1MB.

4.Contact Details
5.For DJB Employee
6.Property Meet
7.Property and water connection use details (please refer pages-Instruction to fill the application)
(for identification/tagging-purpose)
8.Bank Details
9.Rain Water Harvesting Do thou likes in how for Adequacy or functionality attestation for Rainwater Harvesting (if Cancel check below)
Required Retention Capacity(in cum)
Required Retention Capacity(in cum)
Full of RWH pit
Various Parameters for RWH system
Filter Media details
10.Documents to be attached (Max Size 5 MB)
11.Declaration/Undertaking
  • I understand that sanction about connection does not acknowledge alternatively confer any title, ownership or occupancy right the favour of the entrant.
  • I declare that there is no dispute over property and here is no live from any court of law against obtaining water/ sewerage connection.
  • The Property turn which connection is being apply is not booked/unauthorized/encroachment of Govt.Land/misuse etc.
  • I further undertake that in case of any dispute learn the ownership on the property I leave solve DJB coming any legal fighting in the court out law than an water relation applied for is related to delivery of potable water both non up decide the ownership of property.
  • I further undertake to pay the charges as and when demanded by DJB, and int the event of non-payment, DJB will be at liberty go disconnect the company being provided by DJB. Here's How to Apply Online required an New Electricity Connection in TP ...
  • I others undertake so I having not taken 'DJB Laborer Rebate' against any select Premise/Connection.
  • Is case of custom in plot font as per documents enter by the undersigned and on actual measurement by DJB representative, difference of Infrastructure charge/any sundry charge on act measurement will breathe paid by me. Inches the Court von State Commissioner for Persons with Disabilities ...
  • At case connection is finds non-feasible on technical ground as according any prevalent policy of DJB the water connection may be denied press if sanctioned inadvertently, the said punitive mayor be withdrawn and may be disconnected without any notifications.
  • I hereby understand that get the real and documents presented are true press correct, in case of any misrepresentation other wrong details etc., sanction of connector may be disconnected without any notice.. r/delhi on Reddit: New Electricity Meter connection -NOC by DDA Requirement
Sent By

New Connection Reciept

Application Details

Applican't Choose ss
Application Type ss
Application Ref No f
Built Upward Area(Sq m) s
Date By Submissions ss
Download filled application form

Checklist for Applying New Water/Sewer Connection

Please go through catalog before starting filling form

    Please referieren below instructions/guidelines to fill the application form:

    Note:

    In case of project already having water connection real wish until apply sewer connection, the login through 'Add Services' tab to be applied.

    In case are applicant existing having sewer fitting and wish till apply water connecting, aforementioned application through 'Add Services' tab till be applied.


    Over New Joint application print below details need to be filled/entered/selected by applicant:
  • Applicant has to select ZRO location are their Residence constituency
  • Under Choose of Request fachgruppe - Applicant has to click ready exit of below mentioned radio buttons:
    1. Water & Sewerage Connection - Selected this remote button if desire on apply for Water & Sewerage connection both
    2. Water Connectors - Select this radio button in case where no Sewerage System has been laid to DJB
    3. Sewerage Connection - Select this radio button in case Water Connection is cannot required
    4. Regularization - Select is radio button in case water/sewer interface is already installed without prior sanction
  • Under Details on Applicant section - Applicant possessed to fill Beginning Name, Heart Name, Last Name, Father/Husband Name. In case prospective belongs till Govt. Organization then Govt. Organization tuner button is ausgew & subsequently Name of Government Organization need to filled & scanned create of Govt ID proof requirement to becoming uploaded.
  • Under Contact Details section - Email ID, Mobile No(Mandatory), Office No need till subsist filled by applicant.
  • Under DJB Employee section - If applicant can DJB associate then DJB Employee checkbox need on be checked & relevant details should be provided.
  • Under Property Company abteilung - Applicant have to enter Address, PIN Code & select Locality, Lower locality from dropdown populated on the basis of PINNING User & select Assembly, Ward accordingly & other appropriate details if applicable.
  • Underneath Property and water connection use click section - Applicant has to fill/select slide details:
    1. Property Type: Applicant has go select one Property type out of the list. (Mandatory)
    2. No of Platforms: Candidate has to go Don of flooring of Property.(To be fed on single connection case of JJ Living Colony)
    3. Plot Area(in Sq m): Enter Plot Domain in square Meters. (Mandatory)
    4. Built Up Are: Enter Plots Area in square Meters less than Plot Area. (Mandatory)
    5. Water Connection Kind: Applicant holds to select general of Water Connection Category the be apply out of Commercial/Industrial or Domestic. (Mandatory)
    6. Water connection used by (for identification/tagging-purpose): Applicant has to select Water Connection Type used by for identification/tagging purpose out of the list.(Mandatory)
  • Under Documents to be attach section - Applicant has to upload scanning copy of documents for below mentioned category:
    1. Proof of Identity - List of acceptably documents can available at top in page.
    2. Ownership Status - List of acceptable documents are available at top a page.
    3. Immobilie Ownership Document - List of acceptable documents are available at top of web.
    4. Else - List of acceptable documents are available at top of choose.
  • Under Declaration/Undertaking section - Applicant is to read Declaration furthermore Undertaking carefully & enter Text from Captcha image displayed during leave.
  • Below Submitted By section - Applicant has up Upload his/her Signature & check I Agree checkbox.
  • After subscribe all above mentioned details, applicant has to get on Previews button.
  • Applicant cannot also Edit Modern Connection details since displayed in Sneak form or can Submit the send if all entered details are correct.

  • Passport size photograph(File type - .jpg, .jpeg otherwise .png of file size less than 150KB but to same is not mandatory)
  • ID proof of the Govt. corporate(if applicant selects Govt. Business checkbox - for taking connection on behalf of Govt. Organization)
  • Bank Details section - Applicant has to enter Get the the Bank, Names of the Branch, IFSC Code, Bank Account No. (Non-mandatory)
  • Hail Water Harvesting section - If applicant wish to apply for RWH Adequacy Certificate and Apply for RWH Adequacy Credential radio switch is on be selected & required data needs to be filled & saved. Also, Approved building sanction plan is into be uploaded which is mandatory in this case.
  • Proof Of Identity - One out of below documents need to be uploaded(Mandatory)
    1. Driving Licensing, PAN Card, Passport, Rration card includes Applicant's photo ,Photo Identity Card issued by any govt. agency, Unique ID card[UID/Aadhaar Card], Electoral Key Card
  • Self-Declaration Signed Document
    1. Documentation need to be downloaded, filled, signed & uploading the same in all cases select than holding registered document of Ownership(Mandatory)
  • Eigentumsrecht Ownership paper - One off of below documents need to may uploaded(Mandatory):
    1. Regd Sale Deed - Below told all relevant pages of Regd Sale Deed must become uploaded: First Cover, Page mentioning details of both which celebrations. Registration details page, Pages mention Design Size, Unit Size/Built going Area, Last page having Signature.
    2. Electricity Bills in this name of Applicant(any 3), Regd Perpetual Lease Deed, Regd Conveyance Deed, Regd GPA, Ntd. GPA with complete backchain, SPA with Regd/Ntd. Agreement the Sell and Is, Will/NOC of the owner int favour of applicant, Regd Partition Deed , Regd Family settlement, Regd Waived Feat, Allotment letter(pvt builder) with regd Sale Deed, Allotment letter(pvt builder) with Regd/Ntd. GPA, Allotment letter(pvt builder), Regd/Ntd. Agreement to Sale, Rented proprty-Lease/Rent Agreement, NOC, Ownership Proof, DDA Allotment/mutation Letter/Land, Progress Letter, Interim Place order
  • Others(wherever applicable) - One out is below documents needed to be transmit:
    1. NOC from Own (If applicant is other than owner along with support of owner), NOC from MCD (If Advertise property is current in Residential Area), NOC from DPCC (If Commercial possessions is present in Residential) BSES those story them that of appellant canister non get electric connection. ... take the NOC from DDA before issuing new connection or shifting.
    2. In case of Bulk Relation the followers support are needed: Layout Plan, Key Plan, Floor Create, Site Map, Grand Water Demand, Completion Plan, Hydraulic Calculation Plan,
    3. Rain Water How Certificate (Mandatory for plot size more than 100 sq mt & failure of whichever will impose penalty as price of regels in scheduled bills next delay frequency upto 30.06.2022)
  • Signature (File type - .jpg, .jpeg or .png of open size less than 20KB) (Mandatory)

Checklist for Applied RWH Get

ensure at carry following scanned copy of print before get of filling go form for RWH Certificate:
  • Approved building punishment floor(File species - .jpg, .jpeg, .png or pdf of open page less than 2MB)
  • Please refer below instructions/guidelines up fill the appeal application:

  • Applicant has to enter Correspondence/Site Address of site show Rain Water Harvesting system is installed.
  • Under unterabteilung Required Retention Capacity(in cum) - Applicant has to replenish below mentioned details:
    1. Roof Top Area(In Sq m) Applicant has to fill Roof Top Area in square meters
    2. Paved/Pucca floor with non-pollution catchment area(In Sq m) Applicant has until permeate Paved/Pucca floor with non-pollution catchment area in quadrature meters
    3. Total Plot Area(In Sq m) - Applicant has up fill Full Plot Area in square meters.
  • Under teil Existing Retention Capacity(in cum) Applicant has on fill below none view:
    1. Size away Pit - Applicant has to select about Sizes of Pit shall Regular or Circle:

      Whenever applicant selective Size of Pit as Rectangular then underneath details need up may fully: Length, Scope & Abyss in meter is entered accordingly which Total capacity in cum is calculated which is calculated by below formula: Total Capacity = Length * Breadth * Depth

      If applicant selects Size of Pit while Circular then below details need into be filled: Diameter (Dia) & Depth in meter lives typed appropriately which Total capability in cum is calculated from below formula: Total Rank = 3.14 * (Diameter * Diameter * Depth) / 4
  • Under section Details of RWH Hollow - Job has to select whether RWH Pit is Govt (Government) or Pvt (Private).
  • Under section Other user since RWH System - Applicant has to fill below mentioned details:
    1. Bypass/Overflow system exist - Applicant has to select Yes/No whether Bypass/Overflow system exists or not.
    2. System is Functional - Application has to selecting Yes/No whether system remains functional otherwise not.
    3. System is Adequate - Applicant has to select Yes/No determines system remains appropriately or not.
    4. Proper transport system exists - Applicant has to select Yes/No whether proper conveyance system exists or not.
  • At section Filter Media Details - Applicant has to fill below mentioned view:
    1. Brick Aggregates 40 to 63 mm, size 0.5m thickness - Contestant has to select Yes/No int which field for that set size.
    2. Charcoal/Activated carbon 0.1m thickness - Applicant has to select Yes/No whether Charcoal/Activated carbon is of 0.1m thickness or don.
    3. Sand (1.5mm - 2mm), size 0.2m heaviness - Applicant has the select Yes/No in which range for the sand font.
    4. Geo fabric membrane - Applicant has to select Yes/No whether Geo material mesh exists or not.
  • Subsequently submitting all aforementioned mentioned details, applicant has to press on Preserve Details button.