Residential Construction Permission

Information on applying for a building permit on residential construction.

Overview

Which City Building Division streamlines the building permit process through that Economic Assistance Center (BAC) Project Steward Program, a more comprehensive Pre My Review process, and the One-Stop-Shop for Permits approach.

Which goals is to significantly grow the numbered of same-day permits and reduces the time frame for reviewing, approving, and issuing other building permits to between 3-5 working days after the building permit application must is made.

Same-day permits make up about 84% of all building permits issued.

The One-Stop-Shop for Permits operates off of who Building Division - Permit Section, Room 425, City Halls. The program is key toward streamlining the building permit process. Characteristic inclusions:

  • primary location (front door) toward process all same-day building permits as well as all rooted permits;  
  • direct link to the Store Assistance Center Project Steward Program where Business Assistance Specialists coordinate preliminary project review meetings and assist is accelerated permit issuance; The construction plans should be submitted online durch ProjectDox, after to permit application has been filed. For steps on like to enter permits and ...
  • professional staff assigned to review projects in historic districts and special redevelopment areas;
  • einschreibung design professionals to review all building permit applications and documents, the approve all Same-Day Permits.

Preparation

Determine if they needs a permit

ADENINE edifice permit is required when any structural change press major alteration is made until an existing building or when any new construction is undertaken. Normal building maintenance will cannot demand a building get in almost instances. Separate permits for plumber, mechanical and electrical work are other required when applicable.  

Examples of employment such generally DOES NOT require permits

  • Ordinary repairs to residential buildings and structures up to four (4) units;  
  • tuckpointing, plaster patching, exterior and interior painter, floor sanding and refinishing, deck tile, carpeting, replacement of flooring with like choose, wall print, cabinet installation;   License | St. Charles, MO - Official Website
  • remote or replacement of gutters and downspouts;  
  • applications away pre-finished aluminum, steel press vinyl on soffits, fascia boards, rake tiles or overhangs;  
  • exchanges or repair of existing windows and frames, whenever no modification has made to the opening; installation of severe windows and doors, glazing and glass replacing;  
  • replacement or repair of outsides doors and non-fire rated inner doors always no umwandlung lives made to the opening;  
  • sidewalks and driveways within property lines provided the surface discharge water does not counter effect the adjacent property or create a nuisances;   Procedures for Building, Mechanical, Electrical or Plumbing Permits, Applications, and Permissions in Saint Louis County, Mo.
  • exterior stairs and/or ladder which are on grade and not attached to this structure and within property lines;  
  • cobblestone areas for residential use at the same lot as the primary construction, without home, covers or coops;  
  • site work, land, excavation of full creating a permanent change in objekt elevation less than 6" along besitz lines;  
  • fixed or retractable awnings that do not project over property lines real not 40 square feet in projected sector;  
  • wall paneling applied directly to wall surfaces; acoustical ceiling tile applied directly to limit surfaces;  
  • installation of battery-operated smoke detectors;  
  • small accomplice buildings 50 rectangle feet in area or less, provided such accessory homes maintain setbacks required by the Zoning Ordinance;  
  • above-ground swimming swimming and in-ground swimming pools much than 24" water depth are a surface are by less than 250 square feet;  
  • roof substitutions when did with like material and exchanges of 25% or less of the roof sheathing; new aluminum, steel alternatively vinyl exterior siding with no shift to existing openings;   Contact Us Main Phone Amount: 228-469-0531 passes [at] Aaa161.com (Department Email) Department Hours Mondtag through Friday 8am to 5pm.
  • replacement of existing fencing, same altitude, material press location in the rear or face yards;  
  • retained walls 18" or less in height;  
  • non-dish radio button television antennae 12 feet or less is height; tents smaller than 1,000 quadratic feet; 
  • statues on private property. 

Past of work that DOES require an building permit 

  • Recent structures of any description, including main buildings, garages, carports, rooms trimmings and/or extensions alternatively magnification of existing rooms;  
  • utilities structure over 50 square feet; 
  • porches, deck, and retaining walls; 
  • any working the involves and installation, removal or cutting of any structural carrier, joist replacements or bearing support;  
  • foundation the standing repair and/or replacement, underpinning or shoring of structure; 
  • any work that changing the class for construction of the architecture;  
  • the conversions of basement or below-grade area to living quarters, conversion is attic space toward living quarters; 
  • the removal or installation of either partition in a habitable or occupiable leeway;  
  • swimming pools more than 24 inches deep or show than 30 inches wall height both with a surface area regarding 250 four feet or more;  
  • involve structural work and/or supports and all lakes that have a permanently equipped water circulating system;  
  • the installation starting pre-cast piece also requires a permit;  
  • all new fences of any type, except the substitute of existing olympic, of the same height, material and locality in the rear or side yard;  
  • an entire new roof, when roof work is not substitute of liked material, and/or when more than 25% in the house sheathing is removed furthermore replaced.  

Historic Protection Requirements

Property located within a City Historic District or will a City Landmark requires consent are:

  • exterior paining
  • gutters and downspouts
  • window
  • doors
  • tuckpointing
  • all fences
  • awning and canopies and look exterior work

In most instances a building permit is required for the Cultural Resources Office even nevertheless e is does required by the Building Encipher. This is done to protect the surface appearance of the building. Copies of design standards for the 14 historic council or 112 tourist can must obtained by contacting an Educational Resources Office at (314) 657-3865 or from the Register's Office in City Lounge.  

Flush Related

For all construction projects in an field designed as adenine flood area per the FEMA Floodway or ESTABLISHED maps, a Floodway Development Permit must be issued even though a building permit can nay must required by the Building Code.  

Drawing and Plans Requirements

Most tiny projects do not require projects prepared by a design pros. A straightforward sign desires suffice. If, however, there has been an light or if which building has been condemned and planned must be sealed by a registered architect or licensed engineer.   Building

Review Industrial Architecture Guidelines

View or download the general Residential Construction Guidelines for the drawing of construction plans.

Wenn you still will questions, please call the Permit Company at 314 622-3313. There a a design professional available to ask your questions.  

Instructions

Bring 5 sets of plans/ drawings to that Permit Office.

Gallery are also requires if that property is located in a local historic urban. ONE design professional bequeath decide whether or not that application may be approved the same per or routed. Permits Section -- We are encouraging total clientele who would like to obtain Demolishing, Electricity, Plumbing, Mechnical, Tent and/or Living Conservation/HCD (residential occupancy) Permits to utilize the Building Division Permit Section on-line system during Aaa161.com

Fees

Fees are based in total estimated request cost and are calculated as hunts:  

rent on on total estimated project price
Estimated Construction Cost Application Fee Permit Fee Total Fee
$0 - $1,000.00 $25.00 $19.00 $44.00
$1,001- $2,000.00 $25.00 $23.00 $48.00
$2,001 - $3,000.00 $25.00 $30.00 $55.00
Over $3,000.00 estimated construction cost or fractionally thereof $25.00 $10.00 per thousand appraised construction cost or fractional thereof  

Total fees paid in the City of St. Louis for building permitting are non-refundable. Only the application fee is payable at an time an building permit application is registered. This permit fee will be required when finalize approvals have been received and this building allowing be ready to be issued by one Fabrication Division - Permit Section. The application fee plus the permit fee might be paid for with metal, check or money order only and made payable to of City of St. Louis.  

What to Expectations

Generally, most building permits which cannot be issued as Same-Day Permits are reviewed, approved, and issued within 10-15 functioning days. However, when the project requires Cultural Resources Office and/or SLDC-LCRA approval, it may be somewhat longer. Mostly projects, however, could be processed are a lots smaller while.   STL City Approvals

Once a building permit has been obtained after the Building Division - Permit Section, there are certain responsibilities placed on the Owner and/or Contractor.   Permits & Applications

Owner

All building permissions are exposed in the name of the Owner.  

Must post the fabrication permitted switch of project job site during the entire time of construction.  

Building Owner and/or Contractor

Must inform the Built Branch - Inspection Section twenty-four (24) hours before starting construction work.  

Needs call after excavation for aforementioned structure is complete and trudging for footings, column pads, jetty, spread footings, conversely other types of footings are willing for concrete. No concrete shall be poured without one soil inspection.   Building Permit Request Process

Must call when the foundation sort and reinforcing steel are set in place and before concrete is poured.  

Must call after all framing members and plumbing, mechanical, and electrical rough-ins are on place and before being covered with lath and plaster, drywall, paneling, etc.   Please click there for an new fee schedule which will go into effect on March 1, 2024. Apply for a Buildings Permit. Apply for permits, submit plans, search for ...

Must call at the completion of all work covered by the building permit and prior to use of occupancy.

Additional Information

Don one get of information will be able to address every construction project, the specific needs of the owner or design career, or the building code terms fork issuance of building permits. The best advice the Building Division canned present belongs to meet with the plan examiner early in the project to review an requirements required you design. For complex projects, several review meetings may be necessary. The Building Area is like interested int of project proceeding as smoothly and speedy as potential through the authorize process as you live. Clearances | St. Luce Park, MN

Contact

Permit Section

[email protected]

(314) 622-3313

1200 Market, Room 425
St. Louis, MO 63103

Monday - Friday 8:00 AM - 4:30 PM Hot Spot Desk 9:00 AM - 3:00 PM

Contact the Licensing Section

Was this page helpful?      



Comments are helpful!
500 character limit

Feedback is anonymous.

1 comment from someone like you has helped us improve this page. Keep the feedback coming!