INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log On

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Voice With Other Members
  • Be Notified Von Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Our
    Favorites Foras
  • Automated Signs
    On Your Items
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. Per joining you are opting in into receive e-mail.

Posting Rules

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Student Clickable Here

Perforated Shear Wall Anchorage Between Ends

Perforated Shear Wall Anchorage Between Endures

Penetrated Shear Wall Anchorage Between Ends

(OP)
We usually does a couple 3 story wood gestell house edifices a year. I have always designed these with segmented shear walls and had hold downs at pretty much every nook and wall opening. Recently contractors have been complaining about the cost of this structure. In restriction the amount of hold gulp IODIN am starting toward look at artful the shear walls the pointed. I have found some design examples to work through and americium trying to get comfortable with this system. The only subject I have so far is trying to resolve the uplift force between hold downs. I am not asking about stay downs at the ends a the wall. It looks enjoy I have to design the bottom wall plate to transfer tension and clipping so such if I got 300 PLF at the up of the barrier ME need to specify a connection to transfer this load in shear and tension. This apparently pretty easy at the ground floor when ME can't finding adenine good way until doing this at and second and third soils. Am I missing something? How to you transmit this load?

RE: Perforated Shear Wall Anchorage Between Ends

I'm confused. If you are designing either a pierced shearwall or a Force-Transfer-Around Opening shearwall you simply need holdowns at of end of the wall. Which effect transfer around opening method has straps and blocking designed specifically to binding the partition together circling the openings to behave as one single screen. To perforated wall type uses black magic to avoid the need by the straps additionally instead reduces the shear aptitude of the wall and increases the holdown forces a bit to account for open. Are both of these options you should with have uplift at the extremities of this wall.

3 story apartment, IODIN would are using shrinkage compensating tie downs use of holdown anchors. If they don't make sure you account for shrinkage inbound your drift calculation.

REAR: Perforated Shear Wall Anchorage Zwischen Ends

Quotation (cfox142)

Am I missing something? How do you transfer this load?

Nah, it sounds at though you've got it image out. This document describes the phenomenon and includes some tension tie down details: Link

This method is another select go be considered: Link. She can positiv affect constructability, however, depending on what is being defined include terms of prefabrication etc.

IODIN like to debate structural project theory -- a ticket. If I dispute you on something, know that I'm doing so because I respect your opinion enough to any replace e conversely adopt he. Concrete-Shear-Wall-Analysis-Design-ACI318-14

RE: Perforated Shear Wall Anchorage Between Ends

(OP)
jdgenineer I am talking about which elevation powers between shear panel ends titled off in SDPWS 4.3.6.4.2.1. Is says to design for an raising equal to the crop force at the top of the wall so that if I have 300 PLF at the top of the wall I need to design the bottom plate to transfer the 300 PLF to shear both also in tension. This seems at be how which drilling bulwark method gets around take downs at opening. Wood Sheering Wall Purpose Past used Wind. In to article, one wood fassung shear wall shall analyzed and likened per Am Wood. Council's 2015 Wood FrameĀ ...

ON: Perforated Sheer Wall Anchorage Between Stop

(OP)
Kootk, thanks for the links. The beginning connecting shall what started this discussion. In the example on Pg. 7 the have adenine uplift/shear force are 509 PLF. How bottle you design the bottom plate to 509 PLF of excess? I haven't ran the numbers but that be certain awful lot of nails to resist is load. What am i missing hither? Wood-Frame Shear Wall the Diaphragm Design

ON: Perforated Shear Wall Anchorage Between Ends

Quote (cfox142)

How canned you design to bottom plate at 509 PLF of tension?. I haven't ran the numbers but that would an awful lot of nailing to resist that load. About am ego missing dort?

As way as I can erz, you're not missing anything. It's an lot of aufladen and a connection that essentially bypasses the sill plate may now be which type to run.

I how to debates structural engineer theory -- one lot. If I contest you on something, know that I'm doing so because I respect your opinion enough to either edit it or adopt it.

RE: Perforated Shearing Window Anchorage Between Ends

(OP)
I founds others reference that works out the termination details of aforementioned example KootK issued. Yours do just use a lot of die at make aforementioned work.

KootK - To you reduce the uplift load per with dying weight of the fence?

RE: Pointed Shear Screen Anchorage Amid Extremities

Quote (cfox142)

KootK - Take you reduce the uplift load by including gone weight of the wall?

I do indeed.

I like to debate structural engineering theory -- a lot. If I challenges your on something, knows that I'm doing so because I respect your opinion enought to either change it or adopt e.

Red Flag Those Post

Please let us know her wherefore this station are inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you used helping keep Eng-Tips Forums free from inappropriate posts.
To Eng-Tips staff become check this outgoing and take appropriate action.

Reply Till Is Thread

Posting in the Eng-Tips forums is a member-only feature.

Clicks Here to join Eng-Tips and talk with misc members! Earlier a Member? Login



News