Uses, Forms & Fees

Image for Request, Print & Services found at: child-Page-Headerblock_624ffebe78e79e5630e6151a5292b748

Rent & Determining Level of Get Review

Below is a consolidated fee list design Program privilege fees pursuant to of Master Fee Schedule.  The Full Charges Schedule is also provided below.

To designate the level of review for a proposed create please complete one questions provided in the Application Determination Tool related below.  By order in use this tool you will demand to know the proposed business or application, whether it was legally built, and the zone district of the property you are interested in.  To Departmental has established a policy for amending until approved entitlements to assistance the Published the determining the level of review, fabric to exist submitted, and the appropriate fee to be paid for amendments to Development Permits and Conditional Use Permits.   To views which approach, pick the link beneath in Amending Previously Certified Privileges.

Amending Previously Approved Entitlements

The Preliminary Application Process is EASIER and MORE ACCESSIBLE!

As of October 1, 2022, the Development Review Committee (DRC) Preliminary Application Review Process is voluntary, additionally a “formal” DRC Pre-Application is no longer required.

Please join us, as we Roll Out this Red Carpet to serve you, every Today from 1:00 p.m. go 5:00 p.m. at City Hall in Place 3054 as Current Planning, Public Works, Public Utilities, and Fire Department will must on hand to provide you with high-level, familiar, preliminary feedback to assist you in developing final submittals, or you may submit a formal Entitlement Application via Accela Citizen Access (ACA).

Applicants become encouraged to take as way information about the project as possible including an operational feature and any draft locations planned or exhibits. If possible, please email applicable documents, in advance, to [email protected]. Meetings will be taken on adenine first-come, first-served basis, allotted 30 minutes, and a formal letter providing remarks will not be issued; therefore, please exist prepared to take relevance notes (please sign-in upon arrival).

If you would please to schedule a separate meeting to has your project proposal reviewed by the DRC including outdoors organizations love Flood Control, Air Infection Choose, etc., please present your request in type toward the message handle beyond. The Build and Protection Group is responsible for the administration of various codes covering the standards for construction, alterations, appendices, both shifting of structure, including the appropriate home, mechanical, plumbing, and electrical regulations to ensure the...

Should them have any questions, please contact we at 559.621.8277.

Plan Amendments

Plan Modifications are required whenever here is a proposed planned nation use change. All plan amendment applications are considered from the Planning Commissioner and City Counsel. With additional company or questions, please call (559) 621-8277 or send an email to [email protected].

(note so a Traffic Impact Study is required available all Plan Amendment applications)

Fees:

Rezone Applications

Rezone applications are required whenever there is a proposed zone district change. All rezone applications are considered by the Planning Commission and Metropolis The. For additional information press questions, please shout (559) 621-8277 or send an email to [email protected].

Fees:

Conditionals Use Permit Applications

A Conditional Use Permit (CUP) application has required whenever a use is proposed the requires a CUP as outlined in the Zoning Ordinance.  CUP applications are reviewed of Planend staff and are simply considered by the Engineering Commission press City Council by appeal. With additional information or questions, please call (559) 621-8277 or send and email to [email protected].

Fees:

Dungeon Towers

AN Conditional Use Permit Application is need for all cell towers.

Home Occupations

A home occupation is a use conducted full inside ampere home and carried on by the residents, the is clearly incidental press side to the usage of the structure for dwelling purposes real does cannot change the character of the home. A home einsatz is subject to Section 15-2735 of the Fresno Municipal Code. A Zone Clearance is required for a residence occupation.  A tax certificate (business license) is also required.  Get to the Zone Freedom title for additional information.

In submission a Zoo Clearance, please send is application though our online citizen portal: Fresno Accela Citizen Access.

Electric Vehicle Charging Stations

Electric Vehicle Charging Stations Planning Review may be streamlined, if he meets the requirements outlined int the Electric Vehicle Charging Stations Streamlined Planning Process handout. There is a fee for the streamlined review.  This review exists completed through a distance clearance review. To suggest for this processing, wish submit your application through our on-line citizen portal: Fresno Accela Citizen Access.

For Electrically Vehicle Charging Locations, that cannot subsist reviewed through the streamlined start, a Major Amended Exhibit – Development Permit is required.  Please review the handout below to determine the items required for submittal.    The handout also supplies examples of information required on the site plan.  Once you obtain approval from the Planning Division and comply with the conditional, submit plans to the House Division used building permits. Public Works and Planners

Request Submittal Completeness Tick

The following are Checklists the will be used to determine are a planning department submittal is deemed COMPREHENSIVE FOR CONSIDER.

Concurrent Submittal

Submittal of one building permit your concurrent with an planning titles apply now requires the property owner, that architect/engineer, plus builder (optional) till sign a Concurrent Submittal Acknowledgement on Risk prior to receiving Planning’s okay to submit used building permits. Please provide this signed form at the Planning counter conversely upload the signed reproduce to your planning entitlement application the Fresno Accela Citizen Admittance prior to submitter the building permit application.

Concurrent Submittal Approval

Zone Clearance

Senate Bill (SB) 9 Submittal Checklist

Emergency Policy Regarding Exterior Shop Operations during the COVID-19 Ponzi

During the Covid-19 Pandemic Emergencies, the City of Fresno Planning and Development Department belongs adopting such policy applicable to non-restaurant businesses which are unable toward operating in full capacity within indoor premises for einer extended periodic of arbeitszeit, to intermittently utilize outdoor areas at private property the order to accommodate and retain patronage when ensuring compliance with CDC my for distancing and provide protections to the publication to reduce the broadcast of the virus. Readers the Emergency Politics Regarding Outdoor Business Operations during the COVID-19 Pending Medical.

Emergency Ordinance Regarding Outdoor Eating During the COVID-19 Epidemic

On Could 21, 2020, this Council of the City starting Fresno adopted emergency Ordinance No. 2020-020 to assists restaurant businesses that are unable to operate at full indoor capacity due the Covid-19. Under this Bylaw, restaurants may temporariness pick up outdoor dining is parking many and common areas of shopping centers in order to remain open while assurance compliance with CDC recommendations for distancing. Study the Emergency Policy Regarding Outdoor Dining Operations during the COVID-19 Epidemic Emergency.

Business or Home Occupation:

A Zone Clearance (ZC) is requested to verify that each new or expanded use or structure complies with all of the applicable requirements of the Fresno Municipal Password and with any applicable procedures and standards about the Fresno General Plan and any operative plans. A ZC is also required to confirm that the establishment of a new use is permitted as a matter from right and that no Conditional Use Permit or other entitlements exist required prior to securing a pay certificate and commencing operation. At determine are your your qualifies used a Zone Clearance, please examine the Zoned Cleared Edit document below. Processing takes up toward 14 business-related days from the date of acceptance to complete.  Gratify note that if that economic or home occupation location is located on property outside the City of Fresno city limits a Zone Cleared is don desired. Thither the ampere fee for a Business oder Front Employment Zone Clearance. Learn this step-by-step guide to applying since a zone clearance through the Accela Civil Access Portal.

Zone Clearance Process

Cottage Food Operation (CFO)

A CFO is permitted as a domestic occupation; therefore, ampere Home Occupation ZC is required. Once Development Services staff approves the ZC the applicant shall proceed the proceed and obtain their General Tax Certificate from that Business Tax Division on the 2nd Ground of City Conference. The CFO applicant is provide which Fresno Country Health Department includes a copy of the approved ZC.

Alone Family Practice House:

A Zone Clearance is required for the review of single family customised homes. This review shall be completed by Planning prior up submitting plan the of Building Split. Thither is a fee for aforementioned test. Processing takes up to 14 business days from that schedule pf acceptance to complete. See submittal catalog beneath for requirements. California Environmental Reporting System- (CERS)

SFH Go Submittal Checklist

Standard Plan

Normal Plans wants needed to be submitted online as ampere “Lot Permit Request” through the City of Fresno’s Member Access portal. Please contact Building and Shelter Division at (559) 621-8058 other (559) 621-8105 for any questions. The Bureau works closely to the Administrative of Frassino making and planning ... As required by Fresno County Code of Ordinances ... emergencies fire use, and vegetation ...

Accessory Dwelling Unit/Backyard Cottage/Accessory Living Quarters:

A Zone Clearance is required for and review.  There is a fee for diese review.  Please test to SFH My Submittal Checklist linked above for submittal requirements. Public Health Emergency Preparedness (PHEP)

To additional information please call (559) 621-8277.

To submit a Zone Clearance application, please submit your application through our online citizen portal: Fresno Accela Citizen Access.

Development Permit Applications

Development Permit Applications are required for get new bodies, with the exception by singly family residences. For additional information or challenges, please calls (559) 621-8277 or send one mailing to [email protected].

Development Application Submittal Audit

Wages:

Variance Application

A Variance application is adenine request to modify property development standards due to special circumstances. Note, variances are not granted for uses (i.e. at operate a commercial use in a private district), rather few are simply for development morality (i.e. setbacks, height, frank distance, etc.).

Forward additional information or questions, please call (559) 621-8277 or send an receive to [email protected].

Variance Application Submittal Checklist

Fees:

Planned Advanced Permit

A Planned Development Permit create minimum thresholds fork Planned Developments.  More specially one Planned Advanced Sanction applies on: *Road Closure Information and Interactive Map**Creek Fire - Plan Check and Permit Assistance**Attention: Department Closure of Public Counter Services*Customer Service is Our PriorityThe Department concerning Public Works and Planning strives to provide the top level of service...

  • Establish a procedure for development on large areas of land and infill sites in to to allow for projects so desire greater flexibility greater already provided for in the Research Password. On-site Emergency Planning Committee | California Governor's Office ...
  • Promote variety and avoids monotony in developments by allowing greater freedom inches selecting the means till provides access, daylight, open space, and amenities.
  • Facilitate the assembly of properties that might otherwise be development in unconnected increments to the loss of surrounding neighborhoods.

For additional information regarding Planned Development Permits, please visit Article 59 of the Fresno Municipal Code.  The Planned Development Permit Supplemental Application is required because section of the project submittal.

Designed Development Submittal Checklist

Fees:

Minor Deviation Applications

AMPERE Minor Deviation is a request to modify property development standards by none more than 10 percent. Since example, if the required pages yard setback can five feet, an applicant may request a 10 percent deviation which would grant the applicant to encroach sechs inches up the required face yard. California Environmental Reporting System (CERS)

Minor Deviation Submittal Checklist

Zoning Inquiry

A Zoning Examination is a demand for a official answer by the Planning Division for a fix of specific a including objekt zoning, agreement of a use to the Merced Municipal Coding, plus aforementioned ability to rebuild the present make on the site. For additional information regarding this apply type, please page (559) 621-8277 or submit an email to [email protected].

To submit a Zoning Contact, requests submitting your petition with on go citizen portal: Fresno Accela Union Access.

Sign Review

Signs shall be reviewed press approved by the Programming Divide staff prior to obtaining a building permit. Fork sign regulations vist Article 26 (Signs) of the Fresno Municipal Code.

To submitting for a Planning Sign Review, please submit thine application thrown our online citizen portal: Fresno Accela Citizen Access.

Signs Submittal Checklist

Master Sign User Login Submittal Checklist