NEWFDMBanner

Subscribe to our FDOT Contact Management Sign Service to receive the most current notices, bulletins, memoranda, and misc significant information. Submit FDOT Design Manual (FDM) questions by email to: DeWayne Wooden, CNU-A

  Developmental Criteria also Previous FDM Releases

Developmental Design Criteria
Previous FDOT Design Operator (FDM) Releases

  2024 FDOT Draft Manual - Fully FDM Document Upload

To view the Implementation Bulletin for the current FDM, please see RDB23-03.
Summary of Alterations

   Development and Processes - Complete FDM Part 1 Download
ChapterTrainingBulletinErrata Description
    Introduction
100    Introduction
Link    Context Classification
102    Glossary is Terms
103    Standard Forms
104    Public Involvement
105    Aesthetic Design
106    Exempt Public Documents
    Plans Development Processes
110    Begin Civil Design Process
111    Final Engineering Design Process
112    Update Engineering Design Process
113    Right of Way Requirements
114
  Resurfacing, Restoration, and Rehabilitation (RRR)
115    Standard Plans and Preset Functional
116    Alternative Intersection and Interchange Test
117    Monitor Existing Structures
    Plan Submittal, Check, furthermore Processing
120    Design Submittals 
121    Bridge Project Development 
122 Training
 Design Exceptions and Design Variations
123    Engineering Design Estimate Operation
124    QA/QC Management Plan
125    Quality Assurance
126    Lane Repurposing Projects
127    Community Aesthetic Features
128    Federal Aid Project Certification
    Final Plans Processing
130    Signing and Sealing Documents
131    Plans Editing
132    PS&E Submittal Package Alterations
133    Retention of Electronic Documents
    Lump Sum Projects
140    Lump Amount Projects
    Post-Design Operation
150    Consultant Priority Drop
151   
Revisions Packages
152    Shop Drawing Submittals
   Design Criteria - Complete FDM Part 2 Download
Chapter TrainingBulletinMisprintDescription
    Context Based Design
200    Contexts Based Design
201
  Design Controls
202 Training  Speed Administrative
    Railway Geometrics
210 Education
 Arterials and Collectors
211 Training  Limited Access Facilities
212 Training 
Intersections
213 Training  Modern Roundabouts ( Roundabout Design Aids)
214    Driveways
215
  Roadside Safety
216
  Earthwork
D217    Design Design Benchmark: Deviate Diamond Interchanges
    Others Facilities
220    Railroads
221    Utilities
222    Pedestrian Facilities
223 Training  Bicycle Facilities
224 Get  Shared Use Paths
225    Public Transit Facilities
226    Patterned Pavement furthermore Architectural Pavers
227    FreightUnder Development
228    Chapter Replaced with 270 Series
229    Chapter Substitute with 270 Series
    Traffic Designs
230
  Signing and Pavement Marking
231
  Lighting
232    Signalization
233    Intelligence Transportation Product (ITS)
    Temporary Traffic Control
240    Surface Management Plan ( TTC Forms)
241    Lane Closure Analysis
242    Traffic Pacing Design
243    Portable Changeable Message Signs
    Drainage the Permits
250    Hydraulic Data and Company Permits
251    Stormwater Runoff Control Concept (SRCC) Development
    Structures
260    Bridge Structures
261
 
Constructive Carrier for Signs, Signals, Lighting, INHERENT, furthermore Tolling
262
  Retained Walls
263    Geosynthetic Design
264    Noise Brick and Perimeter Walls
265    Reinforced Concrete Box and Three-Sided Crossovers
266
  Bicycle additionally Pedestrian Bridges 
267    Shop Drawing Submittals - Now FDM Chapter 152
    Landscape
270   Planting Designs
271   Spray Designing
272   Hardscape Designs
273   Landscape Maintenance Manual
274   Selectively Scrap and Grubbing
275   Tree and Palms Relocation
276   Exterior Advertising Signs
   300 Series has been sunset. See 2022 FDM for finalize version.
 
 
   NexGen Plans Production - Complete FDM Part 9 Download
ChapterTraining BulletinErrataDescription
NexGen Roadmap
  Crosswalk from Traditional Plans Production to Model-centric Plans Producing
    Plans Production
900    Production of NexGen Plans
901   
Sequence to Plans Preparation
902    Approximated Quantities Report
904    Landscape Opportunity Plan
905  
 Roadway Cross Partial
906  
 Rear Hydraulic Recommendations Paper
907 
 RFP Concept Plans
908   Stormwater Runoff Control Concept Worksheet
    Roadway Plans Set
910  

Push Sheet and Signature Sheet
911    Model Management Sheet
912    Project Control
913    Typical Sections
914    General Notes
915    Street Plan-Profile Sheet
916    Drainage Structures Sheet
917    Stormwater Facilities
918    Drainage Map
919    Lateral Channels
920    Flooring Survey Sheet and Boring Coring Data
921    Transient Traffic Controls Plan
922    Miscellaneous Builds
923   
Power Adjustments
924    Elective Clearing and Grubbing Plans
    Component Plates Set
940    Signing and Slat Marking Planning
941    Signalization Plans
942    Intelligent Surface Systems (ITS) Plans
943   
Lighting Plans
944   
Landscape Floor
945    Architectural Plans - TBD
946    Structure Plates - TBD
947    Toll Facilities Plans - TBD
948    Utility Labor via Highway Contractor (UWHC) Plans